Asphalt driveways
Hard-wearing asphalt for long driveways, rural access and commercial carparks. Brisbane to the Sunshine Coast.
Built for the long haul
Asphalt is the practical choice for long driveways, rural properties and commercial sites — it goes down fast, handles heavy vehicles well, and is straightforward to patch and maintain down the track.
We prepare and compact the base first, since that's what actually determines how long an asphalt surface lasts, then lay and roll the asphalt to fall correctly so water runs off instead of pooling.
What's included
- Excavation, base preparation and compaction
- Correct falls and drainage before any asphalt goes down
- Laying and rolling to a consistent, driveable finish
- Edge and kerb tie-ins
- Commercial carpark and laneway resurfacing


FAQs
Is asphalt cheaper than concrete?
For long driveways and larger areas, asphalt is usually the more cost-effective surface. For shorter residential driveways the gap narrows — we'll price both if you're not sure which suits your job.
How long does asphalt take to cure?
Asphalt is driveable much sooner than concrete, often within a day once it's cooled and compacted, though it keeps hardening over the following weeks.
Do you do commercial carparks and laneways?
Yes. We've done commercial laneway and carpark work in Brisbane's CBD as well as long rural driveways further out.
Related: Concrete driveways · Excavation & site cuts
Ready to price your driveway?
We'll come out, measure up and send a free written quote.
